top of page

This Lead Acid battery comes with AGM or Absorbent Glass Mat technology. It can produce 4.5 Ah/ 6 Volt. It can be an ideal pick for your car.

Long Lead Acid AGM Battery (4.5Ah/6 Volt)

37٫00﷼السعر
الكمية
    • Batteries ‏ : ‎ 1 Unknown batteries required. (included)
    • Product Dimensions ‏ : ‎ 7.11 x 4.83 x 10.16 cm; 798.32 g
    • Date First Available ‏ : ‎ 20 February 2013
    • Manufacturer ‏ : ‎ Long
    • ASIN ‏ : ‎ B00BHM0JTC
    • Item model number ‏ : ‎ WP4.5-6
    • Best Sellers Rank: #194 in Automotive (See Top 100 in Automotive)
      • #1 in Automotive Replacement Batteries
    • Customer reviews: 

      4.1 4.1 out of 5 stars    106 ratings

لا توجد مراجعات حتى الآنشارك أفكارك. كن أول من يترك مراجعة.

منتجات ذات صلة

bottom of page